ACADEMIC YEAR 2015-16
YEAR 10 TERM 1 PROJECT
This year's T1 project was a first aid box and there were some impressive examples manufactured, along with the usual specification/research/design/development and evaluation work.
igcse projects 2016
Y11 students have been completing their exam products. As usual there is a wide variety of projects.
|
|
Poom's brass photo holder from the metal working project>
2015 Y11 IGCSE project work
The Y11 group have finished work on their IG projects for 2015.
Sneha's design for a House awards cabinet.
Zen's design for workshop tool storage
Mansi's design for a new school reception area
TERM 1 2014-15/manufacture Y10
CONCEPT MODEL for a House display area: each school house has a trophy cabinet and area to promote their activities. One unit for each house. 3D printed concept model for Sneha's IG project.
Y10 T1 project 2014
2014-2015
Y10 METAL WORK
Y10 IG students worked with brass recently to create a cute hinged locket as part of their RM work and worked their way through some 2mm flat bar mild steel as well which involved a lot of heavy duty hammering.
Y10 First Aid Boxes 2013
IGCSE PROJECTS 2014
Year 11 students have finally finished their exam products and the project books are being finalised.
Below is a selection of work from the IGCSE group.
Below is a selection of work from the IGCSE group.